Website:https://www.sce.com/wps/portal/home/about-us/community/camp-edison/big-creek/!ut/p/b0/04_Sj9CPykssy0 (Big Creek Hydroelectric Project)
Description:Dam; Hydro-Electric Plant with Spillway and Walkway in Mountain/Lakeside setting; Rock Outcroppings, Gorge, Canyon Walls, Pine Trees; Dam Height over 100 Ft.
Site Condition:SCE’s Big Creek Hydroelectric System generates approximately 1,000 megawatts of power which is 90% of SCE’s hydroelectric power and 20% percent of SCE owned power generation capacity. The Big Creek System, located in the central Sierra Nevada Mountains, is comprised of 6 major reservoirs, 27 dams, 9 powerhouses, and miles of interconnecting infrastructure earning it the motto “The Hardest Working Water in the World.”
General Notes:verified 1.9.24 bd
Jurisdictions::FRESNO COUNTY FILM COMMISSION - FLICS, Sierra National Forest - USFS
Within 30-Mile Zone: N
State Property: No
Closed/Vacant: No
GPS Source:Google Maps (interactive), x coordinate: 36.7477272, y coordinate: -119.7723661
Building Materials: Concrete
Contacts: Fujikawa, Richard M. *Transmission & Distribution | Acquisition, Southern California Edison2 Innovation Way | PIV 2, 2nd Floor, Pomona, CA 91768 United States714.657.6950 Mobile[email protected]https://www.sce.com/partners/real-estate-and-locations/film-locations-scouts
* Key Contact